Well flow rate measurement with a mobile metering skid
The mobile metering unit provides a complete cycle of oil well flow rate measurement: delivery, installation, measurements, and documentation of results.

Increase
Preparation and delivery of the skid
- Delivery of the metering unit to the measurement site;
- Equipment completeness check;
- Installation and connection of the mobile metering unit piping to the wellhead valves.
Measurements and Data Processing
- Measurements and Data Processing;
- Pressure relief and draining of liquid from the measuring tank and pipelines;
- Creation and maintenance of a database based on measurement results.
Documentation and Control
- Documentation of measurement results on a 24/7 basis;
- Verification of data accuracy and unit calibration;
- Ensuring personnel safety during operations.